1989
|
Lisheng Metal Processing Factory
was set up. |
1990
|
Put into production. Its major products:
sports items such as barbells, padlocks,
etc. Employees: over 30. Annual Output: over
200 tons. |
1991
|
Produce crank shafts, bonnet, cylinders
etc. for ZEL Tianjin |
1992
|
Produce cookers and exported to Middle
East. |
1994
|
Develop business with Tianjin Machinery
Import and Export Company. |
1995
|
Tianjin Baoyi Industrial Products Co.,
Ltd. Was set up on May 1.
Developed cylinders, crank shafts and upper bearings with Beijing Embraco & Snowflake
Compressor Co. Ltd. |
1996
|
Self-designed, manufactured and installed
a semi-automatic molding line.
Introduction of 5 S concept and A management modes
Develop flanges and gearbox for German SEW company. |
1997
|
Overall reforms of technology
Develop business with Beijing Auto and Motorcycle Import and Export Co. |
1998
|
Utilize duplexing melting by both cupola
and electric furnace. |
| 1999
|
In September, install Japanese
FBO-j molding line.
In November , obtain ISO9002ㄩ1994 certification( French BVQI)
Develop crank
shafts,cylinders and lower bearings with China Resource (Shengyang)
Sanyo Compressor Co. Ltd. |
2000 |
Develop pumps and valves with Danfoss
Tianjin |
2001 |
Implement TPM equipment
management mode;
Develop housing, flanges
etc. for Sumitomo (SCT) Cyclo Drive Tianjin
Ltd. |
2002 |
Install the German ECO
resin sand molding line;
Develop bearing
housing with US GE .
Install Japanese FBM-i
molding line and American Hunter molding
line. Annual Output exceeded 5000 tons. |
2003 |
On July 1st Baoding Factory was set up. |
|
In October, FBO-j molding line was installed
in Baoding factory. |
|
In October, obtain ISO9001:2000 certification |
|
In October, Tianjin Baonuo Machinery Manufacture
Co., Ltd. was established. |
|
Annual output over 8000 tons.
|
2004 |
In January the QS-9000 was certified by
SGS |
| |
In January Ninghe County Steel Factory
was acquired. |
| |
Develop auto parts with international
auto makers |
2005 |
Introduced Enterprise Resources Systems in April. |
|
We retained Beijing Duoxing Co., Ltd. and PMGI Co., Ltd. to diagnose our production and management in June. |
2006 |
We set up Canadian Operation Agency in November. |
|
The annual casting output is over 12000 tons. |
2007 |
Retained foreign technicians and managers in January to improve our product quality and technique level, which made great effect on the company. |
| |
Carry on TS16949 Quality Management System in March. |
| |
The casting yield of the year reached to 14000T. |
2008 |
newly established microseism pneumatic casting production line. |
| |
Developed the project of elevator for America campany OSHKOSH. |
| |
Under the pressure of the global economic crisis, the company still reached an output of 12000T. |
2009 |
Successful development of the German ZF Group's cement mixer gear unit series parts project. |
| |
|
| |
|